Paso 1
Crear order
Empieza con un draft order que despacho puede revisar y promover desde Freight Orders.
Sin draft preparado
Centro operativo BFG Control
Modo demo grant
Esta pantalla siembra el estado demo respaldado por API, guia cada superficie de producto y mantiene la narrativa end-to-end.

Pasos demo
24
Control, Driver, Client y Finance.
Completados
2
Checks live de la API-backed session.
Ultimo draft
Sin draft preparado
Visible en Orders y Control Tower tras sembrar.
Pasos demo
Control, Driver, Client y Finance.
Completados
Checks live de la API-backed session.
Ultimo draft
Visible en Orders y Control Tower tras sembrar.
Pilot sign-off
Aceptacion reviewer antes de abrir Readiness.
Control presenter
El estado demo repetible tiene marca 09 jun, 00:25 y escribe mediante la scenario API local.
Pilot sign-off
Abre Readiness para aceptar 5 reviewer checks.
BFG Brain
1/6 gates del presenter estan listos; quedan 5 bloqueos antes del live demo sin huecos narrativos.
Scenario Readiness
2/24
2/24 pasos guiados tienen live ScenarioStore evidence.
Deck Package
26
26 slides estan disponibles para offline grant review y live jumps.
Reviewer Export
0/4 ยท 0/7
Reviewer Export lleva adapter, assignment, release y rollback proof para handoff.
Adapter Evidence
0/5
Connection, dry-run, migration runbook y data cutover proof son necesarios antes del production handoff.
Release / Rollback
3/5 ยท 0/4
Release gates 3/5 y rollback checks 0/4 protegen el demo close.
Mobile Proof
0
0 seรฑales de Driver, upload y Client Portal prueban field execution y customer visibility.

Accion recomendada del presenter
Sembrar full demo state
2/24 pasos estan listos. Ejecuta full demo seed antes del reviewer path.
Checklist de bloqueos del presenter
Seeded state llega a 100% antes de la live story.
Demo Deck y print pack siguen el orden del presenter.
Reviewer Export contiene el acceptance package para grant review.
DB/auth proof es visible sin exponer secrets.
Release handoff y rollback drill estan listos para preguntas.
Driver y Client mobile paths son visibles y responsive.
Grant handoff
Reviewer proof coverage is mapped to the live presenter story while file-local remains the local demo store until db-auth-session-adapter infrastructure is selected.
Presenter Proof Coverage
2/24
The guided story must close every product-visible step before the grant demo starts.
Deck And PDF Coverage
26/26
26 live deck slides mirror the reviewer narrative and printable handoff.
Reviewer Export Coverage
0/4 ยท 0/7
Reviewer Export carries DB/auth connection, dry-run and adapter proof for db-auth-session-adapter.
Driver Mobile Proof
0
Driver status, uploads and dispatch proof are packaged before opening the reviewer route.
Release Evidence
3/5
Release gates 3/5 are visible with rollback drill evidence.
Local Demo Risk
file-local
file-local is reviewer-safe for local proof; real DB/auth wiring waits for selected infrastructure.
Handoff de artefactos del presenter
El presenter refleja el paquete reviewer 29 + PDF: 26 slides, 27 proof points print/PDF, enlaces de manifest y prueba DB/Auth wiring.

Interactive proof deck
26 slides
Handoff de artefactos del presenter
29 + PDF
Route smoke evidence
127/127
Screenshot Manifest actualizado
21 jun, 01:24
Timestamp del paquete desde artifacts/demo-screenshots/manifest.json.
PDF Manifest actualizado
21 jun, 01:25
Timestamp del export PDF desde artifacts/demo-deck/manifest.json.
Checksum del paquete de capturas
29 archivos / 21.3 MB
SHA-256 add4d8e645ad; origen artifacts/demo-screenshots.
Checksum del artefacto PDF
11.8 MB
SHA-256 68ebceee9626; origen artifacts/demo-deck/bfg-flowcontrol-demo-deck.pdf.
Manifiesto de integridad
/assets/demo-package-integrity/manifest.json
Abrir/copiar artifacts/demo-package-integrity/manifest.json; generado 15 jun, 21:30.
Abrir manifiestoControles de copia SHA completo en Reviewer
add4d8e645ad / 68ebceee9626
Abre Reviewer Export en el manifiesto de artefactos con botones para copiar SHA-256 completo de capturas/PDF.
Abrir controles SHA en Reviewer ExportEvidencia SHA completa en Readiness
29 + PDF
Abre Readiness artifact evidence con los mismos controles SHA-256 completos y contexto Production NO-GO.
Abrir controles SHA en ReadinessReviewer Proof Entry Coverage
add4d8e645ad / 68ebceee9626
Abre Reviewer Export en las filas Proof Entry Coverage que llevan los loop anchors de Dashboard y Website a la evidencia final.
Abrir coverage en ReviewerReadiness Proof Entry Coverage
29 + PDF
Abre Readiness Artifact Evidence, donde los loop anchors de Dashboard y Website quedan aceptados como proof final de readiness.
Abrir coverage en ReadinessDelegacion de Printable Deck aceptada
Reviewer + Readiness
Reviewer Export y Readiness confirman el proof-entry hint de Printable Deck como final live coverage.
Abrir hint de Printable DeckInteractive proof deck
26 slides
Abre el live deck desde la ruta guiada del presenter.
Printable proof pack
27 proof points
Abre la ruta print que genera el PDF proof artifact.
Reviewer export package
29 + PDF
Abre Reviewer Export con package freshness y artifact manifest.
PDF artifact path
artifacts/demo-deck/bfg-flowcontrol-demo-deck.pdf
PDF offline local generado por el packaging script.
Screenshot manifest
29 screenshots
Abre el manifest publico del screenshot package.
DB/Auth wiring proof frame
ProductionDbAuthAdapterWiring.v1
Abre el screenshot dedicado ProductionDbAuthAdapterWiring.v1.
Route smoke evidence
127/127
Route smoke se mantiene en 127/127 rutas localizadas.
Owner evidence packet
Anna Kowalska mantiene el trail de decision para db-auth-session-adapter; BLOCKED_PENDING_DRY_RUN sigue bloqueado hasta elegir infraestructura DB/auth real.
Alerts owner action
ProductionDecision.v1
Alerts & Approvals mantiene la accion de confirmacion owner para db-auth-session-adapter.
Abrir AlertsBlocked owner task
Anna Kowalska
Tasks mantiene a Anna Kowalska responsable antes de iniciar live DB/auth wiring.
Abrir TasksAudit event registrado
BLOCKED_PENDING_DRY_RUN
History registra BLOCKED_PENDING_DRY_RUN como production DB/auth decision trail.
Abrir History
Handoff copiable
Owner packet para reviewer export
Copia evidencia de Alerts, Tasks y History para Anna Kowalska antes del wiring productivo de db-auth-session-adapter.
Presenter acceptance
1/6 presenter acceptance items are ready for reviewer handoff before the story starts.

Guided story ready
The presenter story has live ScenarioStore evidence before the demo starts.
Reviewer export linked
Reviewer Export carries DB/auth connection, dry-run and adapter proof for handoff.
Release and rollback checked
Release and rollback proof stay visible before production questions.
Guided story ready
2/24
The presenter story has live ScenarioStore evidence before the demo starts.
Deck package aligned
26/26
The live deck and PDF stay aligned with Presenter and Reviewer Export.
Reviewer export linked
0/4 connection / 0/7 DB/auth
Reviewer Export carries DB/auth connection, dry-run and adapter proof for handoff.
Driver proof included
0 status / 0 uploads
DriverReviewerLaunch.v1 keeps field status and upload proof attached to the presenter story.
Release and rollback checked
3/5 release / 0/4 rollback
Release and rollback proof stay visible before production questions.
Local demo risk acknowledged
file-local -> db-auth-session-adapter
file-local is local demo proof; real DB/auth wiring waits for db-auth-session-adapter infrastructure.
Paso 1
Empieza con un draft order que despacho puede revisar y promover desde Freight Orders.
Sin draft preparado
Paso 2
Muestra BFG Brain matching, capacity fit y Margin Guard antes de asignar.
AI match y Margin Guard estan listos en Freight Orders.
Paso 3
Demuestra que counterparty review quedo cleared antes de continuar a assignment.
Esperando estado de sesion API.
Paso 4
Show that the selected vehicle, driver and trailer assignment is stored as audit evidence before handoff.
Esperando estado de sesion API.
Paso 5
Muestra que el target DB/auth elegido tiene evidencia de auditoria antes del offline handoff.
AdapterDecision.v1 marca db-auth-session-adapter; 1/7 decisiones de adaptador estan en el demo pack.
Paso 6
Show the redacted endpoint packet that proves the selected DB/auth adapter path without exposing secrets.
ProductionAdapterConnection.v1 checks db-auth-session-adapter via staging.db-auth.redacted; 0/4 connection checks are packaged for final review.
Paso 7
Muestra el replay transcript que prueba el DB/auth adapter path seleccionado antes del cutover de infraestructura.
ProductionAdapterDryRun.v1 reprodujo db-auth-session-adapter; 0/5 checks dry-run estan en el demo pack.
Paso 8
Muestra el SQL/RLS migration runbook que une preflight, replay y rollback evidence en un handoff DB/auth seguro para reviewer.
ProductionAdapterMigrationRunbook.v1 packages db-auth-session-adapter; 1/6 runbook checks are ready with decision BLOCKED_PENDING_PREFLIGHT.
Paso 9
Mostrar el plan batch replay que convierte snapshot, runbook, release y rollback evidence en un handoff data cutover seguro para reviewers.
ProductionDataCutoverPlan.v1 empaqueta db-auth-session-adapter; 0/5 controles de cutover, 1 grupos batch y 5 filas listos en ProductionDataCutoverPlan.v1; decision BLOCKED_PENDING_DATA_CUTOVER.
Paso 10
Mostrar env copiables y evidencia go/no-go antes de cualquier infrastructure cutover real.
Release handoff BLOCKED_PENDING_DRY_RUN; 3/5 gates listos para db-auth-session-adapter.
Paso 11
Mostrar rollback owner, fallback path y audit packet copiable antes del production cutover.
ProductionRollbackDrill.v1 conserva BLOCKED_PENDING_DRY_RUN; 0/4 checks rollback estan listos para Anna Kowalska.
Paso 12
Mostrar que el reviewer path final lleva la decision local-demo GO / production NO-GO antes de hablar del real DB/auth wiring.
ProductionDecision.v1 mantiene db-auth-session-adapter en BLOCKED_PENDING_DRY_RUN; data cutover muestra 0/5 checks, asi que el live DB/auth wiring sigue bloqueado.
Paso 13
Mostrar la aceptacion bloqueada de provider, Auth/RBAC y tenant-secrets owner antes de cualquier real DB/auth wiring.
ProviderSelectionAcceptance.v1 empaqueta owner acceptance de db-auth-session-adapter para Anna Kowalska; BLOCKED_PENDING_DRY_RUN sigue siendo la unica decision de produccion permitida.
Paso 14
Mostrar la decision bloqueada de hosting, region EU, runtime owner y secrets/backup antes del live DB/auth infrastructure wiring.
ProductionInfrastructureDecision.v1 empaqueta hosting, region EU, runtime owner y bloqueos secrets/backup para db-auth-session-adapter; BLOCKED_PENDING_DRY_RUN queda bloqueada para Anna Kowalska.
Paso 15
Muestra el guarded adapter wiring preflight con checks locales listos y live credentials bloqueadas antes del trafico de produccion.
Esperando estado de sesion API.
Paso 16
Pasa al mapa live donde el draft lane se une a telemetria y actividad.
4 lanes activos visibles en Control Tower.
Paso 17
Use the live Control Tower lane action to prove ETA and border updates are persisted before client visibility.
Esperando estado de sesion API.
Paso 18
Abre BFG Driver para mostrar cambios de estado, ruta y comunicacion.
0 actualizaciones Driver en esta sesion.
Paso 19
CMR, POD y foto de carga prueban el workflow movil.
0 uploads Driver en esta sesion.
Paso 20
Muestra que Driver status, uploads, dispatch ETA y offline cache estan empaquetados antes del reviewer export.
Esperando estado de sesion API.
Paso 21
Documents/OCR muestra confidence, campos extraidos y contexto shipment.
Paquete POD/OCR aprobado con 94% confidence.
Paso 22
Client Portal expone estado, POD, invoice package y requests.
0 requests o mensajes Client Portal en esta sesion.
Paso 23
Finance muestra sales invoice, mock KSeF package y accion de pago.
Paquete KSeF para FV/2026/06/0416: Espera.
Paso 24
Vuelve a Control para cerrar con pago, margen y estado ejecutivo.
Pago Espera; margen MD es 800ย โฌ.