Active orders
4
1 orders are on route now
BFG Control command center
Active orders
4
1 orders are on route now
Free vehicles
1
Capacity ready for next assignment
Delay risks
1
1 critical task requires dispatch action
Expected margin
€3,780
3 open invoices linked to active work
Scenario memory
Create a draft order, mark payment, update Driver or send a Client request to fill this activity strip.
Draft orders
0
Finance actions
0
Driver actions
0
Client requests
0
BFG Brain
6/6 reviewer launch gates are ready; 0 blockers remain before Control hands the reviewer into 26 proof slides.
Website Proof
Public proof CTA is live before the reviewer enters Control.
Guided Demo
Presenter seeds and narrates the complete local scenario.
Proof Deck
26 product slides and printable PDF are synchronized.
Reviewer Export
Reviewer package freezes route, adapter, release and rollback evidence.
Readiness
Readiness Center indexes gates, artifacts and pilot sign-off.
Production Proof
8 production proof slides cover adapter, cutover, release and rollback.
Grant handoff bridge
1/6 handoff checks are ready; copy or download the reviewer packet before opening the live demo path.
Screenshot Manifest refreshed
Jun 21, 01:24 AM
Captured package timestamp from artifacts/demo-screenshots/manifest.json.
PDF Manifest refreshed
Jun 21, 01:25 AM
PDF export timestamp from artifacts/demo-deck/manifest.json.
Screenshot Package Checksum
29 files / 21.3 MB
SHA-256 add4d8e645ad; source artifacts/demo-screenshots.
PDF Artifact Checksum
11.8 MB
SHA-256 68ebceee9626; source artifacts/demo-deck/bfg-flowcontrol-demo-deck.pdf.
Integrity Manifest
/assets/demo-package-integrity/manifest.json
Open/copy artifacts/demo-package-integrity/manifest.json; generated Jun 15, 09:30 PM.
Open manifestClosed verification loop
PDF prefix 68ebceee9626 and screenshot package prefix add4d8e645ad point reviewers from the offline pack into live full-SHA copy controls and the public manifest.
Live scenario signals
0
ScenarioStore.v1 activity confirms the dashboard can hand reviewers into the live product story.
Downloadable final pack
26 / 29
The deck, PDF and 29 screenshot package stay available for offline grant review.
Reviewer export linked
0/4
Reviewer Export carries connection evidence and proof links for db-auth-session-adapter handoff.
DB/auth dry-run proof
0/5
Adapter dry-run evidence remains local-demo proof until selected infrastructure is wired.
Release and rollback bridge
3/5 + 0/4
Release handoff and rollback drill stay visible before production questions.
Local demo risk acknowledged
file-local
file-local remains the MVP demo store; real DB/auth wiring waits for db-auth-session-adapter infrastructure.
Live reviewer path
Open the exact surfaces reviewers need after the dashboard packet is copied or downloaded.
Owner evidence packet
Anna Kowalska owns the db-auth-session-adapter production decision trail; BLOCKED_PENDING_DRY_RUN remains blocked until real DB/auth infrastructure is selected.
Alerts owner action
ProductionDecision.v1
Alerts & Approvals carries the owner confirmation action for db-auth-session-adapter.
Blocked owner task
Anna Kowalska
Tasks keeps Anna Kowalska accountable before live DB/auth wiring can start.
Audit event recorded
BLOCKED_PENDING_DRY_RUN
History records BLOCKED_PENDING_DRY_RUN as the production DB/auth decision trail.
AI operations briefing
Route risk, SLA exceptions, document readiness and cash exposure are merged into one MD action view.
Operations score
68
6 live risk signals are weighted from Control Tower, Documents, Tasks and Finance.
Recommended next action
Focus BFG-2026-0418 on Gdansk -> Lviv; 6 open signals need dispatcher attention before finance close-out.
Focus lane
Gdansk -> Lviv
ETA delta
+45 min
Overdue cash
€7,528
Local operations simulator
Advance the live demo one operational event at a time and write every pulse to ScenarioStore.v1.
Route pulse
Control Tower records a Korczowa ETA intervention for the live lane.
Driver milestone
Driver reaches delivery and posts a field update into the trip memory.
Document packet
CMR, POD and photo flags become ready for Documents OCR and Finance.
Client update
Client Portal receives the visible photo request and shipment message.
Finance close-out
KSeF generation and payment state close the invoice loop.
Simulation progress
0/5 Events
Next event
Route pulse
Writes to the same local Scenario Store used by Driver, Documents, Client and Finance.
Demo session console
Seed or reset the API-backed demo state without leaving the dashboard.
Scenario store
GET/PUT API
Stored activity
0 events
Risk proof
0 clearance
Pilot sign-off
0/5 accepted
Demo timestamp
Jun 09, 12:25 AM
Draft order staged
PendingDriver status updated
PendingCMR/POD/photos uploaded
PendingCarrier risk cleared
PendingClient request logged
PendingKSeF package generated
PendingPayment reflected
PendingScenario control
0% of the demo chain is active in this API session.
API session status
Waiting for demo state
Latest draft
No draft staged
Pilot sign-off
Open Readiness to accept 5 reviewer checks.
Risk proof chain
Seed the full demo state to expose partner clearance evidence.
Auth and roles
The local MVP still writes to the file adapter, but API calls now carry actor and role headers that match the future DB/auth adapter.
Session contract
This inspector exposes the local session scope, file adapter and DB/auth upgrade path behind the API-backed demo state.
Session ID
grant-demo-local
Organization scope: org_bfg
Storage adapter
File-local adapter
.bfg-demo/demo-scenario-state.json
Auth scope
Managing Director
Anna Kowalska through mock-auth-header
Upgrade target
DB/auth ready
ScenarioStore.v1
Live session status
Stored events
0
Last write
Not written
Current MVP writes locally, while the API contract is ready to swap into db-auth-session-adapter.
Portable scenario snapshot
Export the exact demo state as reviewer-ready JSON before DB/auth cutover.
Schema
BFGScenarioSnapshot.v1
Checksum
bfg-af2b6b84
Adapter contract
ScenarioStore.v1
Restore snapshot
Restore a saved scenario state into the same API-backed local store.
Final demo chain
One repeatable panel ties delivery, POD/OCR, client visibility, KSeF invoice and payment reflection.
Demo shipment
BFG-2026-0416
Margin captured
€800
Invoice value
€4,895
Order created
DoneDriver delivered
DonePOD/OCR ready
DoneClient sees docs
DoneKSeF invoice ready
DonePayment marked
Awaiting actionMD dashboard reflection
Mark the payment to close the story and show the MD-ready margin reflection.
Payment status
Pending
Executive cash-flow
Receivables, payables, overdue cash and leasing pressure are summarized from the same Finance board data.
Net cash forecast
€6,112
4 upcoming cash events
Receivables
€12,423
2 client invoices open
Payables
€6,311
3 supplier invoices and leases open
Overdue receivables
€7,528
Client cash already past due
Live control tower
Mock telemetry, route progress and border risk are connected to real seed orders for the grant MVP.
OBD2BFG Brain
Vehicle and driver match
88%BFG-204 with Ivan Petrenko has the best fit for this lane.
Margin guard
€1,350Minimum safe rate is €4,991 before risk uplift.
Predictive ETA
Medium riskCurrent ETA is Jun 09, 10:20 AM with local mock risk signals.
Clickable order objects already share data with AI, documents and finance.
BFG-204
On routeVolvo FH 500 · Warsaw
BFG-118
AssignedDAF XF 480 · Gdansk
BFG-311
FreeScania R 450 · Riga
BFG-089
MaintenanceMercedes-Benz Sprinter · Krakow
FV/2026/06/0416
Issued€4,895 · Due 2026-06-20
COST/2026/06/0416
Sent€3,911 · Due 2026-06-13
FV/2026/05/0408
Overdue€7,528 · Due 2026-06-06