Skip to main content

BFG Control command center

Operations dashboard

Active orders

4

1 orders are on route now

Free vehicles

1

Capacity ready for next assignment

Delay risks

1

1 critical task requires dispatch action

Expected margin

€3,780

3 open invoices linked to active work

Scenario memory

Persisted actions in this demo session

Create a draft order, mark payment, update Driver or send a Client request to fill this activity strip.

Ready

Draft orders

0

Finance actions

0

Driver actions

0

Client requests

0

BFG Brain

Control Dashboard Reviewer Launchpad Copilot

6/6 reviewer launch gates are ready; 0 blockers remain before Control hands the reviewer into 26 proof slides.

Reviewer 100%

Website Proof

Public proof CTA is live before the reviewer enters Control.

Guided Demo

Presenter seeds and narrates the complete local scenario.

Proof Deck

26 product slides and printable PDF are synchronized.

Reviewer Export

Reviewer package freezes route, adapter, release and rollback evidence.

Readiness

Readiness Center indexes gates, artifacts and pilot sign-off.

Production Proof

8 production proof slides cover adapter, cutover, release and rollback.

Grant handoff bridge

Dashboard Grant Handoff Bridge

1/6 handoff checks are ready; copy or download the reviewer packet before opening the live demo path.

Ready

Screenshot Manifest refreshed

Jun 21, 01:24 AM

Captured package timestamp from artifacts/demo-screenshots/manifest.json.

Ready

PDF Manifest refreshed

Jun 21, 01:25 AM

PDF export timestamp from artifacts/demo-deck/manifest.json.

Ready

Screenshot Package Checksum

29 files / 21.3 MB

SHA-256 add4d8e645ad; source artifacts/demo-screenshots.

Ready

PDF Artifact Checksum

11.8 MB

SHA-256 68ebceee9626; source artifacts/demo-deck/bfg-flowcontrol-demo-deck.pdf.

Ready

Integrity Manifest

/assets/demo-package-integrity/manifest.json

Open/copy artifacts/demo-package-integrity/manifest.json; generated Jun 15, 09:30 PM.

Open manifest

Closed verification loop

Offline PDF and live SHA controls now close the proof loop

PDF prefix 68ebceee9626 and screenshot package prefix add4d8e645ad point reviewers from the offline pack into live full-SHA copy controls and the public manifest.

Ready
Watch

Live scenario signals

0

ScenarioStore.v1 activity confirms the dashboard can hand reviewers into the live product story.

Ready

Downloadable final pack

26 / 29

The deck, PDF and 29 screenshot package stay available for offline grant review.

Watch

Reviewer export linked

0/4

Reviewer Export carries connection evidence and proof links for db-auth-session-adapter handoff.

Watch

DB/auth dry-run proof

0/5

Adapter dry-run evidence remains local-demo proof until selected infrastructure is wired.

Watch

Release and rollback bridge

3/5 + 0/4

Release handoff and rollback drill stay visible before production questions.

Watch

Local demo risk acknowledged

file-local

file-local remains the MVP demo store; real DB/auth wiring waits for db-auth-session-adapter infrastructure.

Live reviewer path

Open the exact surfaces reviewers need after the dashboard packet is copied or downloaded.

AI operations briefing

BFG Brain daily brief

Route risk, SLA exceptions, document readiness and cash exposure are merged into one MD action view.

88% confidence

Operations score

68

6 live risk signals are weighted from Control Tower, Documents, Tasks and Finance.

Recommended next action

Focus BFG-2026-0418

6 signals

Focus BFG-2026-0418 on Gdansk -> Lviv; 6 open signals need dispatcher attention before finance close-out.

Focus lane

Gdansk -> Lviv

ETA delta

+45 min

Overdue cash

€7,528

Local operations simulator

Operations Simulator

Advance the live demo one operational event at a time and write every pulse to ScenarioStore.v1.

Ready

Demo session console

Run the end-to-end scenario from Control

Seed or reset the API-backed demo state without leaving the dashboard.

API ready

Scenario store

GET/PUT API

Stored activity

0 events

Risk proof

0 clearance

Pilot sign-off

0/5 accepted

Demo timestamp

Jun 09, 12:25 AM

Draft order staged

Pending

Driver status updated

Pending

CMR/POD/photos uploaded

Pending

Carrier risk cleared

Pending

Client request logged

Pending

KSeF package generated

Pending

Payment reflected

Pending

Scenario control

0% of the demo chain is active in this API session.

API session status

Waiting for demo state

Latest draft

No draft staged

Pilot sign-off

Open Readiness to accept 5 reviewer checks.

0/5
Open Readiness sign-off

Risk proof chain

Seed the full demo state to expose partner clearance evidence.

Pending

Auth and roles

Demo session can switch role-scoped API context

The local MVP still writes to the file adapter, but API calls now carry actor and role headers that match the future DB/auth adapter.

Managing Director

Session contract

Demo state has an adapter-ready storage contract

This inspector exposes the local session scope, file adapter and DB/auth upgrade path behind the API-backed demo state.

DB-ready contract

Session ID

grant-demo-local

Organization scope: org_bfg

Storage adapter

File-local adapter

.bfg-demo/demo-scenario-state.json

Auth scope

Managing Director

Anna Kowalska through mock-auth-header

Upgrade target

DB/auth ready

ScenarioStore.v1

Live session status

Stored events

0

Last write

Not written

Current MVP writes locally, while the API contract is ready to swap into db-auth-session-adapter.

Portable scenario snapshot

Export the exact demo state as reviewer-ready JSON before DB/auth cutover.

0 rows

Schema

BFGScenarioSnapshot.v1

Checksum

bfg-af2b6b84

Adapter contract

ScenarioStore.v1

Restore snapshot

Restore a saved scenario state into the same API-backed local store.

Restores through the same contract targeted for db-auth-session-adapter.

Final demo chain

MD close-out reflects the full shipment story

One repeatable panel ties delivery, POD/OCR, client visibility, KSeF invoice and payment reflection.

Ready to close

Demo shipment

BFG-2026-0416

Margin captured

€800

Invoice value

€4,895

Order created

Done

Driver delivered

Done

POD/OCR ready

Done

Client sees docs

Done

KSeF invoice ready

Done

Payment marked

Awaiting action

MD dashboard reflection

Mark the payment to close the story and show the MD-ready margin reflection.

Payment status

Pending

Executive cash-flow

Executive Cash Flow Snapshot

Receivables, payables, overdue cash and leasing pressure are summarized from the same Finance board data.

Cash guard

Net cash forecast

€6,112

4 upcoming cash events

Receivables

€12,423

2 client invoices open

Payables

€6,311

3 supplier invoices and leases open

Overdue receivables

€7,528

Client cash already past due

Receivables vs payables aging

Current receivables€4,895
Overdue receivables€7,528
Supplier payables due soon€3,911
Leasing payments€2,400

Live control tower

EU corridor visibility

Mock telemetry, route progress and border risk are connected to real seed orders for the grant MVP.

Medium risk
HUBGdanskorigin
LOADWarsawpickup
BORDERKorczowawatch
DROPLvivdestination
AIBFG Brainroute scan
BFG-204OBD2
BFG-204
3 telemetry feeds onlineGdansk -> LvivNext stop: Korczowa

BFG Brain

BFG Brain dispatch recommendation

Vehicle and driver match

88%

BFG-204 with Ivan Petrenko has the best fit for this lane.

Margin guard

€1,350

Minimum safe rate is €4,991 before risk uplift.

Predictive ETA

Medium risk

Current ETA is Jun 09, 10:20 AM with local mock risk signals.

Freight pipeline

Clickable order objects already share data with AI, documents and finance.

Live seed
OrderRouteStatusMarginDocuments

BFG-2026-0418

Lviv Farma Logistics LLC

Gdansk -> LvivOn route€1,350Uploaded

BFG-2026-0419

NordGlass Components GmbH

Hamburg -> WarsawAssigned€1,230Review

BFG-2026-0420

NordGlass Components GmbH

Riga -> VilniusNegotiation€400Missing

BFG-2026-0416

Lviv Farma Logistics LLC

Krakow -> KyivDelivered€800Approved

Fleet readiness

BFG-204

On route

Volvo FH 500 · Warsaw

BFG-118

Assigned

DAF XF 480 · Gdansk

BFG-311

Free

Scania R 450 · Riga

BFG-089

Maintenance

Mercedes-Benz Sprinter · Krakow

Finance exposure

FV/2026/06/0416

Issued

€4,895 · Due 2026-06-20

COST/2026/06/0416

Sent

€3,911 · Due 2026-06-13

FV/2026/05/0408

Overdue

€7,528 · Due 2026-06-06